Originally Posted by crazybillybob
The problem with UPS are their so dang inefficent on Batteries, Has to do with the production of AC from DC, and This Rig runs on DC any way.... The power supply that I'm looking at is rated up to 24VDC, so I think if I just run the AC conveter in Parrallel with the BATT line I'll be ok that way, then have a Set OF DPST toggles like for the drive charger, that disconnect the load before enableing the chagering I'll be ok......If I get some time tommorrow I'll scetch up a little drawing on how the charging switchs should work (at least in my mind).