hanks a lot!! :thumb::rock:
yesterday we have started to cut out the lower sidepanels so that they fit on the frame without getting in touch with the optical drives....
so we made a fast sketch of the cutout....
.... and then started to cut it out
after that we started to finish the main reservoir, therefore we drilled some big holes with the same dia the inner pipe has and put everything in place so that we can glue it together step by step....