Page 3 of 4 FirstFirst 1234 LastLast
Results 21 to 30 of 35

Thread: Project: Heavy Water

  1. #21
    Carpe Apenodytes halcyonforever's Avatar
    Join Date
    Mar 2008
    Location
    Oklahoma
    Posts
    260

    Default Re: Project: Heavy Water

    The base for the first tower has just been completed. Next up I will take the two octagons and join them on top of each other with spacers which will create the air intake at the base of the tower. Next up is mounting the 16 poles to create the supports for the tower skin. After that I will pick up the internal components of each tower and create the first working tower. Then start on the second.

    I know this is probably the slowest build ever, but it runs on an extremely small budget (read pocket change). But the pile of parts and pieces has grown to where I can actually get quite a bit of work done before I need funds again.

  2. #22
    Project: Elegant-Li The boy 4rm oz's Avatar
    Join Date
    Mar 2006
    Location
    Balhannah, South Australia
    Posts
    6,411

    Default Re: Project: Heavy Water

    Pics pics pics!!!

    Na mate it's not the slowest build ever lol. Mine has been going for over 12 months now lol.
    Project: Elegant-Li *NEW*
    Project: Alpha FINISHED
    Project: LEXA Revival FINISHED
    Project: LEXA FINISHED Bit-Tech MOTM Nominee October 08

  3. #23

    Default Re: Project: Heavy Water

    you should use smoke machines in this two towers, and maybe green paint around the edge of the towers, so that it look's like some nuclear stuff was spilled out!

  4. #24
    Carpe Apenodytes halcyonforever's Avatar
    Join Date
    Mar 2008
    Location
    Oklahoma
    Posts
    260

    Default Re: Project: Heavy Water

    Here is a picture of the base. viewed from above.

    They are Poplar sections cut to create an octagon. The two will then be joined with cross bracing.



    A smoke machine has definately been an idea with these. I haven't yet decied on it yet. The look I am going for is a clean, professional style, so it looks like an operating facility. I've got room to build in a smoke machine but they will have 150mm fans near the top of each stack and I am not sure how they will disrupt smoke, I am afraid they will blow it out with such force that the smoke effect is lost. It will probably be a last minute trial type of thing after everything else is done but definately a thought.
    Last edited by halcyonforever; 07-28-2008 at 11:46 AM. Reason: 2nd post came in while I was posting.

  5. #25
    Carpe Apenodytes halcyonforever's Avatar
    Join Date
    Mar 2008
    Location
    Oklahoma
    Posts
    260

    Default Re: Project: Heavy Water

    *Shameless self bump*

    Just wanted to let you know that work is still progressing on this, and better than my webserver which got dismantled, hence the vanishing pictures.

    Webserver woes
    The webserver got dismantled, then I changed ISP's and the new one is not as friendly to setup the router. But that should return before too long.

    Progress
    The project got partially abandoned for a few months because my wife is expecting so that has shifted priorities. However it now has a bit of new motivation in that the wife is supporting the project to help get it out of the room that is to be the nursery.

    I have begun stripping the paint off of the exterior panels which is some form of baked on powder coat, but in nasty beige. I have machined off about one panel's worth. The next few cuts are going to put my little dremel through the paces. I have to cut 2 circles through a total of 6 layers of steel. Then 2 straight cuts and some minor triming and the major cutting work will be done. I'll get some picture up again soon.

  6. #26
    Project: Elegant-Li The boy 4rm oz's Avatar
    Join Date
    Mar 2006
    Location
    Balhannah, South Australia
    Posts
    6,411

    Default Re: Project: Heavy Water

    I was wondering where you went lol. Good news about your wife expecting mate.
    Project: Elegant-Li *NEW*
    Project: Alpha FINISHED
    Project: LEXA Revival FINISHED
    Project: LEXA FINISHED Bit-Tech MOTM Nominee October 08

  7. #27
    Does all his own stunts mittelmeier's Avatar
    Join Date
    Aug 2008
    Posts
    372

    Default Re: Project: Heavy Water

    Good to hear your still working on this. Can't wait to see the pictures of what you've gotten done.

  8. #28
    Console God LiTHiUM0XiD3's Avatar
    Join Date
    Aug 2006
    Location
    in your nightmares
    Posts
    1,003

    Default Re: Project: Heavy Water

    um dude... would love to give even a remote opinion... but um ye.. pics where??
    Quote Originally Posted by nevermind1534 View Post
    I wouldn't be surprised if somebody sigquotes part of this.

  9. #29
    Resident 100HP water-cannon operator SXRguyinMA's Avatar
    Join Date
    Jun 2008
    Location
    MA
    Posts
    5,865

    Default Re: Project: Heavy Water

    sounds good so far, no pics yet htough

  10. #30
    Live Long and Modify ContraptionMaker's Avatar
    Join Date
    Oct 2008
    Location
    Central Illinois
    Posts
    122

    Default Re: Project: Heavy Water

    Like I was told on my very first post:



    Would sure love to see some...
    I Build, Therefor I Am!
    http://www.thebestcasescenario.com/f...ine=1224642592
    Live today because tomorrow may never come!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •